GE Vernova

Dogger Bank Offshore Wind Farm – Port of Nigg

Tunnel Engineering has provided temporary works, CDM and specialist health and safety consultancy services in support of GE Vernova’s activities on the Dogger Bank offshore wind project.

The services have included: 

  • Temporary works engineering advice
  • Review of temporary works arrangements
  • Independent Category 3 design checking
  • Review of structural calculations and design assumptions
  • Structural modelling and load-path verification
  • Review of lifting, handling and installation conditions
  • Assessment of temporary and permanent works interfaces
  • CDM compliance support
  • Review of construction planning, management and monitoring arrangements
  • Site health and safety audits
  • Technical advice during project delivery

The work has required consideration of complex lifting and installation operations, safety-critical temporary works and the coordination of engineering and CDM requirements within an operational project environment.